Coming Soon: Changes to Minimum Price Increments, Lot Size, Base Initial Margin and Maintenance Margin

Minimum Price Increments

On 6 Sep 2024 at 04:00 UTC, the Minimum Price Increments for the following contracts will be reduced as shown below.

Perpetual swap 

Current Minimum Price Increment (USD)

Minimum Price Increment (USD) starting
6 Sep 2024 04:00:00 UTC

SUIUSDT

0.001

0.0001

AXSUSD

0.01

0.001

ARBUSDT

0.001

0.0001

BOMEUSDT

0.00001

0.000001

BLASTUSDT

0.0001

0.000001

The Minimum Price Increment (Tick Size) is the smallest increment by which the price of a contract can move. 

A smaller Minimum Price Increment can theoretically lead to reduced bid-offer spreads, useful for price takers when crossing the spread to trade.

Lot Size

On 6 Sep 2024 at 04:00 UTC, the Lot Sizes for the following contracts will be reduced as shown below.

Perpetual swap 

Current Lot Size (Contracts)

Lot Size (Contracts) starting
6 Sep 2024 04:00:00 UTC

XBTUSDT

1000

100

CYBERUSDT

10

1

BNBUSDT

1000

100

INJUSDT

10

1

FILUSDT

10

1

TIAUSDT

10

1


The Lot Size is an instrument’s minimum trading unit (as number of contracts).

A smaller Lot Size means that traders can place orders with a smaller position size increment and participate in trading these contracts with smaller capital requirements.

Base Initial Margin and Maintenance Margin (Leverage)

On 6 Sep 2024 at 04:00 UTC, the Base Initial Margin and Maintenance Margin requirements for the following contracts will be reduced as shown below.

These changes will apply to new positions, new orders and any leverage or Risk Limit changes, applied to existing positions or existing orders. The current Margin requirements for our products can be found here

Perpetual swap 

Base Maintenance Margin starting
6 Sep 2024 04:00:00 UTC

Base Initial Margin starting
6 Sep 2024 04:00:00 UTC

INJUSDT, WUSDT, ONDOUSDT, STRKUSDT, DYMUSDT, MEMEUSDT, JUPUSDT, PYTHUSDT, XAIUSDT, BLASTUSDT, NOTUSDT, ENAUSDT, WLDUSDT, WIFUSDT, BOMEUSDT, TNSRUSDT, PIXELUSDT, MYROUSDT, IOUSDT, ZROUSDT, PORTALUSDT, WOOUSDT, MEWUSDT, AEVOUSDT, 100BONKUSDT, TAIKOUSDT, ZKUSDT, BANANAUSDT, SAGAUSDT

2%

4%

Impact of changes to Base Initial Margin and Maintenance Margin under all Risk Limits (for the above contracts):

  • Initial Margin requirements will decrease, so Bankruptcy Price will move closer to Average Entry Price and Maximum Leverage available will increase.
  • Maintenance Margin requirements will decrease, so Liquidation Price will move closer to Bankruptcy Price and the amount of Maintenance Margin lost in the event of liquidation, will decrease.
  • The difference between Initial Margin and Maintenance Margin will decrease, so Liquidation Price will move closer to Average Entry Price.

In the meantime, if you have any questions please contact Support.

The post appeared first on Blog BitMex

Buy Bitcoin with Credit Card

BitMex Leverage Trading

Automated Trading Bot

Related Posts

Leave a Reply

Bitcoin (BTC) $ 94,157.23 1.97%
Ethereum (ETH) $ 3,401.85 1.73%
Tether (USDT) $ 0.998658 0.04%
XRP (XRP) $ 2.23 1.27%
BNB (BNB) $ 683.15 0.98%
Solana (SOL) $ 192.06 4.43%
Dogecoin (DOGE) $ 0.320586 1.61%
USDC (USDC) $ 1.00 0.01%
Lido Staked Ether (STETH) $ 3,396.76 1.76%
Cardano (ADA) $ 0.898159 0.10%